山东晟亚石材有限公司山东锈石厂欢迎您的光临!
全国咨询电话
18946249118 15214444313

联系我们 CONTACT US
山东晟亚石材有限公司
联系人:刘经理

电话:18946249118 / 15214444313


地址:济宁市汶上县白石镇鑫亚石材厂
新闻资讯
当前位置:首页> 新闻中心>新闻资讯>怎样提高黄锈石石材的质量?
怎样提高黄锈石石材的质量?
来源:http://www.shengyashicai.com 日期:2019-05-09 发布人:admin
 浏览量:
怎样进步工程用山东黄锈石石材质量,石材事业开展的越来越快,越来越多的人喜欢黄锈石,更多的人选择山东黄锈石,很多的小同伴电话咨询我关于黄锈石质量相关的事项,下面我为大家总结一下,希望对大家有所协助。
  How to improve the quality of Shandong yellow rust stone for engineering, the stone industry is developing faster and faster, more and more people like yellow rust stone, more and more people choose Shandong yellow rust stone, many small companions call me about the quality of yellow rust stone related matters, I summarize for you below, I hope to help you.
  如今我们在运用黄锈石的时分一定要留意啦, 如何提供高素质的建筑工程用锈石石材厦门万里石股份有限公司从荒料选择、荒料切割、板材切割、防护处置、排版检验、编号包装六个步骤都用心关注细节。
  Now when we use yellow rust stone, we must pay attention to how to provide high-quality rust stone materials for construction projects Xiamen Wanli Stone Co., Ltd. from six steps: waste selection, waste cutting, plate cutting, protection disposal, typesetting inspection, number packaging, all pay close attention to details.
  一、荒料选择。锈石石材封样之前,依据项目的锈石石材用量以及效果图的请求与设计师充沛沟通,递交相对应契合请求的样品。封样之后,依据客户的终请求选择契合请求的矿山统一坑口来选择荒料,以备消费。一切的荒料在矿山都有编号入库。
  1. Selection of waste materials. Before sealing rust stone samples, according to the requirement of rust stone quantity and effect drawing of the project, the designer communicates with the designer abundantly and submits the corresponding samples that meet the requirements. After sample sealing, according to the customer's final request, the mine unified pit entrance matching the request is selected to select raw materials for consumption. All waste materials are numbered and stored in mines.
  二、荒料切割。荒料到厂之后,会有荒料检品员对到场的荒料做出初步评价,依照花色,石质分级编号入库,并依照荒料规格给出切割倡议,尽量进步运用率。 砂锯,圆盘锯车间会依据荒料课的初步报告选择合适详细项目的荒料编号,然后依照编号领取荒料出库,布置荒料切割。同一颗荒料切完之后依照“荒料编号+大板编号”的格式给每一片大板编号。经检品员二次检验后,做出大板入库清单。这样的编号检验方式,能够保证同一区域里面的黄锈石石材采用同一区域以至同一颗荒料,今后同一项目需求补充供货的时分也能够依据大板编号找到颜色石质相近的大板;
  2. Scrap cutting. After the raw material arrives at the factory, the inspectors will make a preliminary evaluation of the raw material on the spot, store it according to the pattern, stone classification number, and give cutting suggestions according to the specifications of the raw material, so as to improve the utilization rate as far as possible. Sand saw and disc saw workshop will select appropriate scrap number according to the preliminary report of scrap material class, and then collect scrap material according to the number and arrange scrap cutting. After the same scrap is cut, each plate is numbered according to the format of "scrap number + plate number". After the second inspection by the inspector, the inventory of the board is made. Such a numbering inspection method can ensure that the yellow rust stone materials in the same area use the same area or even the same scrap material. In the future, when the same project needs to replenish the supply, we can also find the most similar color stone plates according to the plate number.
山东锈石厂
  三、板材切割。桥切车间关于颜色和质量的控制主要表现在加工的过程中,在做规格切割的加工之前,都会对要切割的黄锈石石材做一个整体检验,关于有裂线,石胆的局部合理躲避,尽量进步成材率;
  3. Sheet cutting. The control of color and quality in the bridge cutting workshop is mainly manifested in the process of processing. Before the specification cutting, a whole inspection of the yellow rust stone to be cut will be done. The local reasonable avoidance of cracked lines and gall bladder will be made to improve the rate of finished products as far as possible.
  四、防护处置。防护处置采用进口思康防护剂,分油性和水性两种;普通为6面3-5次以上重复涂刷方式。
  4. Protection and disposal. The protective disposal adopts imported SCAN protective agent, which can be divided into oil and water. The common method is repeated painting on 6 surfaces for more than 3-5 times.
  五、排版检验。一切的山东黄锈石石材资料板材装置之前,都会在工厂“彩排一次”。在自然光下,确保颜色平均自然;
  Fifth, typesetting inspection. All of Shandong yellow rust stone material plate device, will be in the factory "rehearsal once". In natural light, ensure that the color is natural on average.
  六、编号包装。山东黄锈石石材经过防护处置,以及排板检验之后的合格品,包装人员会依据排版效果给每一片合格品依照装置方向编号包装,并且会在外包装箱上附上两份以上的排板表示图
  Numbered packing. Shandong yellow rust stone after protective disposal and layout inspection of qualified products, packaging personnel will be based on the layout effect of each piece of qualified products in accordance with the direction of the device number packaging, and will be attached to the outer packing box with more than two layout drawings.
相关推荐